Our references
A selection of completed and ongoing projects – from public buildings to private bathrooms.
Drywall / interior finishing
Amazon logistics hall, Ettenheim – drywall work
Services:
- Installation of mineral fibre grid ceilings, Rockfon Pagos Oris
- Installation of suspended plasterboard ceilings, clad with various materials
- Metal stud walls in various designs, clad with various materials for sound insulation/absorption
- Client
- Amazon GmbH
- Execution period
- December 2025 – May 2026
Drywall / interior finishing
Helios Klinikum Rottweil – Unit Dose conversion and interior doors
Services:
- Installation of acoustic grid ceilings, Hygena fittings
- Wall linings and metal stud walls in various designs, clad with various materials for sound insulation/absorption
- Installation of door frames and sound-insulating door leaves
- Client
- Helios Klinikum Rottweil
- Execution period
- December 2025 – June 2026
Drywall / interior finishing
Fire protection refurbishment of Kirchgrabenschule, Albstadt-Ebingen
Services:
- Installation of acoustic grid ceilings, AMF Thermatex Alpha
- Plasterboard border around the acoustic ceiling, running all round, flush, with wall connection
- Installation of suspended plasterboard ceilings
- Installation of access openings and hatches
- Installation of fleece-laminated ceiling sails – OWA – Selecta one
- Installation of wall absorbers – OWAconsult collection wall absorber FreeStyle Q
- Client
- City of Albstadt-Ebingen
- Execution period
- April 2026 – July 2026
Drywall / interior finishing
New sports and multi-purpose hall in St. Blasien
Services:
- Installation of a suspended magnesite-bonded wood wool acoustic ceiling
- Plasterboard border around the acoustic ceiling, running all round, flush, with wall connection
- Installation of suspended plasterboard ceilings
- Magnesite-bonded acoustic wall cladding – HeraDesign
- Metal stud walls in various designs, clad with various materials for sound insulation/absorption
- Installation of shaft walls and wall linings
- Installation of access openings and hatches
- Client
- Town of St. Blasien
- Execution period
- May 2026 – April 2027
Drywall / interior finishing
Extension of the community school (Gemeinschaftsschule), Weil am Rhein
Services:
- Installation of plasterboard metal stud walls / shaft walls / pre-wall constructions, clad with various materials for sound insulation/absorption
- Installation of niches for iPads
- Installation of access openings and hatches
- Client
- Town of Weil am Rhein
- Execution period
- June 2026 – November 2026
Drywall / interior finishing
New single- and two-family homes – interior finishing, Stuttgart and Tübingen area
Services:
- Installation of solid gypsum block walls
- Installation of full-rafter insulation, vapour barrier
- Installation of plasterboard ceilings in living areas
- Filling
- Cladding of window and door reveals
- Client
- various private clients
- Execution period
- since 2025 – ongoing
Drywall / interior finishing
Extension of Christliche Schule Hochrhein, Waldshut
Services:
- Installation of plasterboard metal stud walls / shaft walls / pre-wall constructions, clad with various materials for sound insulation/absorption
- Cladding with impregnated fire protection boards on CLT or OSB panels
- Boxing-in and fire protection cladding of steel beams
- Installation of niches for iPads
- Installation of access openings and hatches
- Installation of an acoustic board suspended ceiling with acoustic fleece, Knauf Cleaneo
- Client
- Freie Evangelische Schulen e.V., Lörrach
- Execution period
- September 2026 – April 2027
Bathroom renovation
Interior finishing – bathroom renovation, various sites in Spaichingen and the surrounding area
Services:
- Complete dismantling and stripping of the old bathroom
- Rebuilding and room design according to your wishes
- Drywall work (e.g. new room layout, pre-wall installations)
- Tiling (wall and floor tiles in various designs)
- Floor build-up & waterproofing systems for long-lasting protection
- Installation of sanitary fittings (toilet, shower, bathtub, washbasin)
- Installation of floor-level / walk-in showers
- Electrical preparation in the bathroom (lighting, sockets, mirror lighting)
- Plastering and filling for smooth, high-quality surfaces
- Wall cladding (e.g. modern panels or seamless systems)
- Installation of bathroom furniture, mirrors and accessories
- Optional: barrier-free bathroom renovation (senior-friendly & comfortable)
- Client
- various private clients
- Execution period
- since 2021 – ongoing
Stone carpet
Stone carpet – exterior stair cladding, various sites in Spaichingen and the surrounding area
Photos: B&A Service GbR staff





























































































